Extensions and extra space (ampliaciones) in València

Adding floor area and opening up an existing layout are different projects. We assess what the plot, building, ownership and planning rules allow, coordinate the appropriate independent professionals, and define the scope before providing a fixed-price quote in writing.

Extensions in València: how the rules apply

Each rule below comes from a municipal, regional or national text listed in the sources. The note says what it means for this job; open a rule to read its full wording.

Permission and paperwork

Pre-checks (art. 13)

Before paying for design, an informe urbanístico or viability consultation can show whether extra area is possible at all; the statutory response periods are one and three months.[1]

Rule wording

Before buying or designing, the Ajuntament offers an informe urbanístico and planning or heritage viability consultations. Article 13 sets response periods of 1 month for the report and 3 months for the consultations; these are statutory periods, not promised project dates.

Start on filing (art. 26)

Where a qualifying opening is declared, demolition can follow filing, but only once the temporary support has been designed and is on site.[1]

Rule wording

A valid declaración responsable with all required documents enables the covered works to start on filing, subject to municipal checks. Filing is not a licence or confirmation that an unsuitable project is lawful.

6 and 24 months (arts. 15.2, 16.8)

A structural job delayed by a community dispute still runs on the six-month start clock, so the vote is settled before filing.[1]

Rule wording

Declared works must start within 6 months of filing and finish within 24 months of starting. The ordinance does not allow extensions except for stoppages caused by force majeure.

Compulsory college visa

When the extension needs a LOE project, its execution project and final-works certificate carry the professional college's visa; that step sits in the programme before construction.[5]

Rule wording

For building work, a professional college visa is compulsory only on the execution project and the final-works certificate of works that need a project under LOE article 2.2, on those documents in legalisation procedures, and on demolition projects that do not use explosives (art. 2).

Official charges and tax

Paid before filing

Paid before filing, on the declared budget for the structural and finishing works together.[3]

Rule wording

The tasa and ICIO are paid before the declaración responsable is filed.

ICIO 4%

Calculated on the execution material cost in the project budget, structural work included.[6, 3]

Rule wording

València’s ICIO rate is 4% of the taxable execution material cost. The declared budget, applicable exclusions and any relief must be checked for the particular works.

Tasa from €140.90

Uses the same base as the ICIO; an extension's larger budget moves further up the sliding scale.[7]

Rule wording

The planning fee (tasa urbanística) starts at €140.90 for a base of up to €6,010.12 and rises on a sliding scale. It uses the same base as ICIO.

IVA 10%

Ordinary renovation of a home you use privately can qualify; added floor area can instead raise the separate construction or rehabilitation test, which is assessed for the contract.[8, 9]

Rule wording

Ordinary dwelling renovation or repair can qualify for 10% IVA when the recipient is a private individual using the dwelling privately, construction or rehabilitation finished at least 2 years before the works, and contractor-supplied materials cost no more than 40% of the taxable base. Qualifying communities of owners are also covered by the law.

IVA 21%

Applies when neither the ordinary-renovation route nor the construction or rehabilitation test is met.[8, 9, 10]

Rule wording

The general IVA rate for ordinary repair or renovation is 21%; the private-home reduced-rate route does not cover rented or business-use dwellings. Construction and works meeting the tax definition of rehabilitation have a separate reduced-rate test, so the contract must be assessed before assigning a rate.

Community and building

Three-fifths (LPH 17.4)

Enclosing a terrace in a block is one of the alterations that needs three-fifths of all owners and quotas, plus affected owners' consent where applicable.[11]

Rule wording

Article 17.4 includes a three-fifths vote of all owners and participation quotas for specified structural or common-element alterations, including terrace enclosure, with affected owners’ consent where applicable. Compulsory works and other specific statutory routes must be considered separately.

Seismic acceleration 0.06 g (NCSE-02)

New structure is checked against the standard that lists València's seismic acceleration; the structural designer records whether it applies to your extension and how.[12]

Rule wording

The seismic standard NCSE-02 lists València with a basic seismic acceleration of 0.06 g and a contribution coefficient K of 1.0 (Annex 1). The standard does not apply to buildings of moderate importance and has further exceptions depending on the building and its structure, so the structural designer establishes whether and how it applies.

Climate zone B3 (CTE DB-HE)

New external walls, roofs and windows of the added space are designed to zone B3's energy-saving requirements where the intervention falls within DB-HE.[13]

Rule wording

CTE DB-HE assigns climate zones by province and altitude: in the province of València, sites up to 50 metres above sea level are zone B3, and the same document gives the capital an altitude of 13 metres. The zone feeds DB-HE’s energy-saving requirements for interventions within the CTE’s scope.

On site and at handover

Architect and technical roles

Once the extension is a LOE project in a residential building, an architect designs and directs it and a technical architect directs execution.[4]

Rule wording

For residential building work within the LOE’s project requirements, the law assigns the architectural project and works direction to an architect, and material execution direction to a technical architect. Specialist designers and other technicians act within their legal competence and the agreed project team.

Plan and document construction waste

Openings and new structure generate mixed demolition waste; the project's waste study and the contractor's plan set separation and transfer records.[14]

Rule wording

For works within RD 105/2008’s project requirements, the project includes a waste management study and the contractor prepares the corresponding management plan; waste transfers need documentary evidence. Minor domestic repair works have a specific exception from those national producer and holder duties and follow local requirements.

Completion records and the building book

You keep the final drawings, structural records and building-book documents for the extended home.[4]

Rule wording

For building works covered by the LOE, the completed project with approved changes, reception record, identification of participants and use and maintenance instructions form the building book delivered to users. The documents required for a smaller renovation depend on its scope and installation work.

Do you need a permit?

València’s 2026 ordinance has three routes. Which one your job takes depends on what it touches and on the building.

  1. No permit

    No part of an extension or a structural opening is on the article 14.f list of exempt interior jobs. [1]

  2. Declaración responsable

    Some structural openings that do not replace principal structural elements fall within UR.LC.140, with its full technical package; whether a terrace enclosure or added area qualifies is established for the specific proposal. [3, 2] [3] [1, 2]

  3. Licence

    Specified changes to volume or to the overall structural system can bring a LOE project, and article 232 works or uncertified article 233.2 works need a licence; whether extra area is possible at all depends on the plot's planning parameters. [4] [1, 2]

The Ajuntament has the final word. We confirm the route for your home before we quote, and we never start works ahead of it.

Three districts, from the municipal record

The 2025 municipal housing sheet records the share of dwellings built in 1980 or earlier. It is context for the district, not a survey of your building.

  • District 19

    69.0%[15]

    Dwellings built in 1980 or earlier

    Pobles del Sud (Pueblos del Sur)

    El Palmar and Castellar each have their own catalogued historic nucleus [16] [17]; an extension to a house inside either boundary is checked against those conditions before any feasibility drawing.

    22,732 Residents[15]

  • District 18

    61.2%[18]

    Dwellings built in 1980 or earlier

    Pobles de l’Oest (Pueblos del Oeste)

    Beniferri's historic nucleus covers about 1.8 hectares and Benimàmet's about 10 [19] [20]; extra floor area is first tested against the plot's planning parameters and, inside a nucleus, its conditions.

    15,589 Residents[18]

  • District 4

    47.9%[21]

    Dwellings built in 1980 or earlier

    Campanar

    With under half its dwellings recorded as built by 1980, much of Campanar is newer housing, yet its village core is a catalogued nucleus [22]; terrace enclosures and additions there begin with that boundary check.

    41,713 Residents[21]

Open the district page for protection rules, barrios and the questions that apply there.

Define the space you need

Adding floor area differs from rearranging existing rooms. Start with the need: another bedroom, storage, a larger living room or access to outdoor space. Compare alternatives against measured dimensions, ownership and planning constraints before developing a solution.

For a house, check boundaries, authorised existing construction and the plot’s planning parameters. In a flat, structure, façade and terraces may be common elements, with their own voting rule. [11] A community decision does not replace the municipal title or other required consent.

Feasibility and the design team

The Ajuntament’s pre-checks can answer a planning question before you buy or design. [1] Statutory consultation periods are not guaranteed construction dates. The appointed professional reviews the planning position, protection and technical feasibility before final construction pricing. The municipal ordinance provides a heritage viability consultation and specific documentation for protected properties and archaeological areas. Check the building’s catalogue entry, protected surroundings and the proposed intervention before choosing a permission route or altering original elements.[1]

Changes to volume or the overall structural system can require a LOE project. LOE article 2 requires a project for existing-building works that alter architectural configuration, including specified substantial changes to exterior composition, volume or the overall structural system, and changes of characteristic use. It also covers interventions affecting protected elements of listed buildings; not every interior refit meets these tests.[4] We coordinate the independent architect, technical architect and specialists required for that scope. [4] The appointment identifies design, calculations, direction, deliverables and fees.

Structural work has more than one route

UR.LC.140 includes certain structural modifications that do not replace or reinstate principal structural elements. A competent technician must establish the intervention, documentation and correct permission route before demolition; a structural change is not automatically covered by a simple interior-works declaration.[3, 2] Certification is relevant to article 233.2, but it does not make every extension a declaration or every uncertified structural change a licence. [1, 2] The load-bearing wall guide explains investigation, design and sequencing.

The programme identifies temporary support, protection, inspection points and areas that cannot be occupied. Work follows the agreed technical documents and effective approvals. A wall is never classified from appearance or thickness alone.

Changes are recorded with their design and permission implications before execution. Handover includes relevant final drawings, certificates, installation documents and instructions, with outstanding items recorded. [4]

How we run it

  1. Free estimate

    Send photos or a short video, or book a call. We tell you what the job involves and give a free estimate.

  2. Visit

    We visit the property, measure up and look at the building, the installations and the community’s rules.

  3. Design and permissions

    We agree the design, coordinate any required independent architect or engineer, and check municipal and community requirements.

  4. Fixed-price quote

    You get a fixed-price quote in writing, with the official fees and IVA shown separately.

  5. Paperwork and works

    We coordinate any required filing and prior approvals before the affected works start. Your project manager tracks progress, decisions and agreed changes.

  6. Handover

    We inspect the agreed work with you, record outstanding items and hand over applicable certificates, manuals and completion documents.

Your questions, answered

Can I close in my terrace?

Only if planning, technical and ownership requirements allow it. LPH 17.4 includes specified terrace alterations with three-fifths of all owners and participation quotas, and affected consent where applicable. Community approval does not replace the municipal permission.

Can I remove a wall to make one bigger room?

Removing a wall is not an extension, but it is assessed the same way: first the wall's structural role, then the design, the community decision for shared structure and the permission route. An opening that modifies the structure without replacing principal elements can fall within the declaration procedure; replacement work cannot.

Do I need an architect for an extension?

The scope determines the legal appointments. For residential projects required by the LOE, an architect undertakes the architectural project and works direction, with technical execution direction and specialist input as required. We coordinate independent professionals within their competence.

Can I add a floor or extend into the garden?

It depends on the plot’s planning parameters, existing authorised construction, title and protection. The competent designer reviews feasibility, with a municipal report or consultation where needed, before additional floor area is promised.

What if the community votes no?

We explain the constraint and consider alternatives within the lawful scope. An internal layout may still affect structure, protected elements or services, so it also needs assessment rather than being treated as automatically permitted.

Sources

  1. Ordenanza reguladora de licencias urbanísticas y de actividades y de otros títulos habilitantes (Pleno 22 Dec 2025, BOP 27 Jan 2026, in force 28 Jan 2026). Ajuntament de València. Checked 31 October 2026.
  2. TRLOTUP (Decreto Legislativo 1/2021), art. 189: building evaluation; arts. 232 and 233: licence and declaración responsable; art. 245: utility supplies. Generalitat Valenciana (DOGV). Checked 3 November 2026.
  3. Sede electrónica procedure UR.LC.140: declaración responsable for works in a flat or common element of a non-catalogued building. Ajuntament de València, sede electrónica. Checked 31 October 2026.
  4. Ley 38/1999 de Ordenación de la Edificación: arts. 2, 6, 7, 10, 12 and 13. BOE. Checked 31 October 2026.
  5. Real Decreto 1000/2010: compulsory professional college visa, art. 2. BOE. Checked 3 November 2026.
  6. Ordenanza fiscal reguladora del Impuesto sobre Construcciones, Instalaciones y Obras, arts. 6.2 (bonuses), 7, 8 and 9.2. Ajuntament de València. Checked 3 November 2026.
  7. Ordenanza fiscal: tasa por actuaciones urbanísticas (current municipal procedure attachment). Ajuntament de València. Checked 31 October 2026.
  8. Ley 37/1992 del IVA, art. 91.Uno.2.10º: reduced rate for renovation of dwellings. BOE. Checked 31 October 2026.
  9. IVA on renovation and repair works in dwellings: conditions for the 10% rate. Agencia Tributaria (AEAT). Checked 31 October 2026.
  10. IVA: works of construction or rehabilitation of buildings intended mainly for dwellings. Agencia Tributaria (AEAT). Checked 31 October 2026.
  11. Ley 49/1960 de Propiedad Horizontal (consolidated text), arts. 7, 9, 10 and 17. BOE. Checked 3 November 2026.
  12. Real Decreto 997/2002: seismic construction standard NCSE-02, section 1.2.3 and Annex 1. BOE. Checked 3 November 2026.
  13. Real Decreto 732/2019: CTE Basic Document DB-HE (energy saving), Annex B climate zones and Annex G. BOE. Checked 3 November 2026.
  14. Real Decreto 105/2008: construction and demolition waste, arts. 4–5 and additional provision 1. BOE. Checked 31 October 2026.
  15. Municipal district 19 report 2025: population sections 1.3/1.8 and cadastral housing age section 5.1 (page 19). Ajuntament de València, Oficina de Estadística. Checked 31 October 2026.
  16. Municipal structural heritage catalogue: 19-06 Núcleo Primitivo del Palmar. Ajuntament de València, Urbanisme. Checked 31 October 2026.
  17. Municipal structural heritage catalogue: 19-04 Núcleo Primitivo de Castellar. Ajuntament de València, Urbanisme. Checked 31 October 2026.
  18. Municipal district 18 report 2025: population sections 1.3/1.8 and cadastral housing age section 5.1 (page 19). Ajuntament de València, Oficina de Estadística. Checked 31 October 2026.
  19. Municipal structural heritage catalogue: 18-01 Núcleo Primitivo de Beniferri. Ajuntament de València, Urbanisme. Checked 31 October 2026.
  20. Municipal structural heritage catalogue: 18-02 Núcleo Primitivo de Benimamet. Ajuntament de València, Urbanisme. Checked 31 October 2026.
  21. Municipal district 4 report 2025: population sections 1.3/1.8 and cadastral housing age section 5.1 (page 19). Ajuntament de València, Oficina de Estadística. Checked 31 October 2026.
  22. Municipal structural heritage catalogue: 04-02 Núcleo Primitivo de Campanar. Ajuntament de València, Urbanisme. Checked 31 October 2026.